Moving Tips

Office Moving in Montreal: Complete Commercial Guide

Up & Out Team May 20, 2025 7 min read
Share
Office Moving in Montreal: Complete Commercial Guide

Planning Timeline: 90 Days to Moving Day

A successful office move in Montreal starts 90 days before the target date. At the 90-day mark, assemble your move committee (typically HR, IT, operations, and facilities), select your commercial mover, and begin the space planning process for the new office. At 60 days, finalize the floor plan, order new furniture, and begin IT migration planning. At 30 days, communicate the move to all employees, begin packing non-essential items, and schedule elevator and loading dock reservations at both buildings.

The most common mistake businesses make is underestimating IT infrastructure lead times. Internet and phone service installation at your new office can take 4-6 weeks — start this process at the 90-day mark. Coordinating with your ISP, phone system vendor, and security system provider simultaneously prevents the nightmare of moving into an office with no connectivity.

Moving Cubicle Systems and Office Furniture

Modern office furniture systems — Herman Miller, Steelcase, Haworth — are designed for disassembly and reassembly, but they require trained installers. A 50-workstation cubicle system takes a specialized crew 2-3 days to break down and 3-4 days to reassemble. At Up & Out, we employ certified furniture installers for all major systems and can often complete the transition over a weekend to minimize business disruption.

Standing desks, conference tables, and executive furniture each have specific moving requirements. Standing desks should be fully lowered and locked before transport. Conference tables over 8 feet often won't fit through standard commercial doorways and need top/base separation. Executive furniture (leather chairs, credenzas) requires furniture blankets and shrink wrap to prevent scuffing.

For offices with 100+ workstations, we use a color-coded labeling system. Each department gets a color, each workstation a number, and every box, chair, and piece of equipment is tagged accordingly. This system allows our crew to deliver everything to the correct location without requiring employee supervision during the move.

IT Equipment and Data Security

IT equipment — servers, switches, UPS systems, printers, and workstations — represents both high value and high sensitivity. Each desktop computer should be backed up before the move. Monitors are individually boxed in original packaging or specialty LCD boxes ($5-$10 each). Servers require climate-controlled transport and are moved by IT-trained movers who understand rack systems and cable management.

Planning Your Move?

Get a free, no-obligation quote from Montreal's most trusted movers in under 2 minutes.

Data security during an office move is critical. Hard drives, backup tapes, and confidential files should be transported under chain of custody with signed handoff documentation. We offer locked, GPS-tracked transport for sensitive materials and can coordinate with your IT team for proper shutdown and startup sequences.

Minimizing Business Downtime

The gold standard for office moves is a weekend transition: pack Friday, move Saturday, set up Sunday, work Monday. For offices under 5,000 sq ft with straightforward IT needs, this is achievable with proper planning. Larger offices (10,000+ sq ft) may require a phased move over 2-3 weekends, relocating one department at a time.

We offer after-hours and overnight moving for businesses that can't afford any daytime disruption. Our crews work 6 PM to 6 AM, and the office is ready for business the next morning. After-hours moves typically carry a 15-25% premium but eliminate the productivity loss of a daytime move. Contact Up & Out for a free commercial moving assessment — we'll walk your current and new space and provide a detailed move plan with timeline and pricing.

Need Help With Your Move?

Get your free, no-obligation quote in minutes.

Call Now